Laser cutting, bending, welding, powder coating, and full cabinet assembly — all under one roof since 2011. Prototypes in 5–7 days, with an inspection report on every shipment.
ISO 9001:2015 certified (Cert. No. 211CM11352Q) · 15 equipment categories, 60+ machines · Zero outsourcing on core processes
Get a Quote in 24h → See Our Specs
Dongguan Shengsi Metal Products Co., Ltd. was founded in June 2011. For fifteen years we have done one thing: precision metal fabrication — stamping, sheet metal, and coating, from drawing to finished product.
We design, develop and manufacture metal parts with strong in-house production capacity and a complete after-sales system. Because every core process — laser, bending, welding, powder coating, and final assembly — runs on our own machines, we control both lead time and quality.
Four product lines, all built to your drawings or samples — from coin-sized stamped parts to complete assembled cabinets.
Charging pile enclosures and energy storage cabinet bodies — structure and finish in one place, co-developed with new-energy infrastructure customers.
Power supply housings and heat-dissipation stampings — vent hole arrays, air-duct bends and mounting holes formed in one stroke for strength plus cooling.
Equipment cabinets, medical carts, ATM series, government and banking self-service terminals — welded, coated and fully assembled in our dedicated final assembly workshop.
The numbers engineers check first. Every value below is a real machine spec from our workshop floor.
| Process | Details |
|---|---|
| Laser cutting | Positioning accuracy ±0.05 mm · thickness 0.5–20 mm · materials: SPCC / SGCC / aluminum / stainless steel · 5 laser machines |
| CNC bending | Max working length 3 m · angle accuracy ±0.5° · stainless steel / aluminum / galvanized sheet · 4 press brakes |
| Stamping | High-speed presses 60–400 T, full tonnage coverage for volume production (+30% efficiency) · 5 presses with in-house tooling |
| Welding | Spot welding / TIG (argon arc) welding — from single parts to complete cabinet frames · 5 spot welders |
| Surface finish | Eco-friendly powder coating line (powder / liquid) · salt-spray resistance ≥500 h · full RAL color range, adjustable gloss |
| Assembly | Dedicated final assembly workshop: structure assembly, electrical integration (wiring / grounding), powered testing & protection-grade checks |
| Inspection | Three-stage QC: profile projector (contour & dimensions) · hardness tester (material & coating) · height gauge (critical dimensions) |
| Other equipment | Tapping (5) · riveting (3) · milling (2) · grinding (3) · drilling (4) · wire drawing, polishing, laser marking, cutting |
Three steps to start, one dedicated contact throughout.
CAD files or a physical sample both work. NDA available on request.
Engineering review of your design — process evaluation and a fast, transparent quotation.
Golden-sample sign-off locks the standard, then scheduled batch delivery.
Monthly volume with the same fixtures and same quality, every batch — up to full cabinet assembly.
Send us a drawing — engineering review and firm quote within 24 hours.
Send us a drawing →